测试台运转前准备工作安全须知有关电器方面的安全须知(翻译成英文)

2025-03-24 06:58:57
推荐回答(1个)
回答1:

写得很辛苦,希望楼主点个采纳,谢谢 Check the equipment status and good condition, check the pipeline pressure gauge, button in the course of transportation is damaged, when one found fault and hydraulic system appears unusual noise, cut off the power supply to stop working and remove the faults, forbidden beyond the scope of the valve pressure test. 3. The electrical safety instructions One three-phase four-wire, ac power: voltage 380 v, 50 Hz ac, control circuit voltage 220 v, 50 Hz ac: non-professional workers banned power control device to avoid dangerous touch. Because one more button, so remind the operators must attach great importance to the problem of security, not after learning the notes, it is strictly prohibited to mount guard. 1. Check the power supply is reliable grounding line, line diameter meets the requirements. 2. Check the power supply sequential is correct. 3. Check signal instructions is correct. 4. One, electrical malfunction, should first shut off the power and fault not relieved, and no one is allowed either. Electrical maintenance personnel must be electrician operating rules wear electrician tools for insulation, there must be a special person to care about maintenance period, or in the power source for warning

记得采纳啊